NL | EN

Presteigne Charter Case Study

New Warehouse Design for leader in Broadcasting Rental Solutions

With a 20 year history, Presteigne Charter is one of the world’s leading broadcast dry hire and systems rental specialists and is also the market leader in the broadcast rental solutions.

With £40 million in broadcasting assets, they offer a truly comprehensive inventory of equipment, maintained by experienced engineers. At every stage, from the initial enquiry through to delivery, they work to the highest standards of customer service. They will suggest the optimum solution based on the client needs, rather than just hiring out individual items. They offer technical assistance and their Hire Desk staff are knowledgeable, flexible, and willing to handle last-minute requirements.

All Presteigne Charter equipment is stringently checked, tested and prepared so it is always ready to go. Equipment is flight cased and they provide all accessories down to the last cable, tripod or grip. They arrange transportation locally, nationally and internationally, and we track and monitor deliveries and collections for clients’ extra peace of mind. Their expert engineers will ensure that the most appropriate equipment reaches you in optimum condition, on time and ready for purpose whatever the scale of the project and wherever it is in the world. They provide clients in locations as diverse as the Masai Mara National Reserve in Kenya for the filming of Big Cat Live, and the Hell’s Kitchen studio in the UK. The nature of their work varies just as greatly, with projects ranging from the G20 Summit in London, to all four Grand Slam Tennis Tournaments in the USA, Australia, France and the UK.

Presteigne Charter engaged The Supply Chain Consulting Group (SCCG) to provide Warehouse design, optimised capacity layouts and standard operating procedures for a New Warehouse Facility required to support their continual business success and growth. The project included providing increased capacity to accommodate stock from an existing ‘Off-Site’ store into the new facility at Manor Royal.

To get a clear understanding of how the business operated the warehouse consultants undertook at total review of the existing storage facilities and operational procedures. Working closely with the Senior Management team it was possible using our ‘In-House’ CAD system to design a fully optimised warehouse facility to include: Optimised design for Pallet Racking, Shelving, Project Build area, Order Assembly & Despatch, Goods in and Quality Checking, Design of Mezzanine Floor for equipment storage and provide designated enclosed work areas for the Technical & Engineering teams to be accommodated below the Mezzanine.

Other Clients in this Sector

Supply Chain and Logistics Specialists

Call us on +44(0) 1926 430 883​

Supply chain and Logistics Specialists highly experienced in all aspects of Supply Chain and Logistics Operations,
Distribution Network Strategy, Warehousing Operations, e-commerce Logistics and Warehouse and Distribution Centre Design.